Wallshell® U-Shield™ Panel System Installation

This video is an animation of Wallshell® U-Shield™ rain screen panel system installation. The system is installed using hidden clips of Wallshell® CG Anchoring system. The animation does not depict all the detailed procedures and steps such as substrate preparation etc. For more details of installation procedure and the standard operation process, please go to www.wallshell.com Builder’s Club page referring to the Wallshell® U-Shield™ Panel Installation Manual.